Channels

Plant for the production of gutters and concrete covers for the high-speed train catenary.

500
m2/day
m2/cycle

0,5

40 kw

400/900

m2

Building and plot

Building size: approx. 400/900m2
Outside stock area: approx. 1500m2

Power: 40Kw

Channels

What is it?
  • Concrete gutters where tolerance is demanding.
  • Other types of assembled parts can be produced in the same facility.
  • Demoulding is delayed until the piece is dry.
Channels types
  • All kinds of gutters and covers for the electrical installations of high-speed trains.
  • Fiber optic channels, telephony, ... where security is important.
Process description

Pieces with strict tolerances are manufactured with delayed release, that is, once the piece is dry.

We need a large number of moulds and moulds are circulating.

  1. We fill the molds and automatically transport them to the drying area.
  2. Natural or steam drying 
  3. Return to the manufacturing area.
  4. Unmould.
  5. Moulds are cleaned.
  6. Moulds are greased.
  7. We repeat the process.

The process can be more or less automatic depending on the client's budget.

What we can produce

    Installations for channels

      Are you interested in this kind of installation?

      Please contact our sales team, they can answer any questions about this or other installations.

      • LABORATORY EQUIPMENT FORLAB
      • IMPROVEMENTS WE CAN IMPLEMENT IN YOUR BLOCK FACTORY
      • TOFORM MOLDS

        Zona Industria
        Ronda de les Conques, 21-23
        08180 Moià - Barcelona

        +34 938 208 181 

        Quality

        ROMETA incorporates components from leading brands known worldwide in electrical and hydraulic equipment.

        Our company is certified in accordance to standard UNE-EN ISO 9001:2015 and our facilities meet the safety requirements of European Directive EEC 2006/42 / C.

        © ROMETA SA