Functioning and performance. Upgrade

 

How manyhours can you workthe installation?
The installationcan workthree shiftsof 7hours+ 1hour of cleaning, lubrication,mold changes.The maximumoutput would be20 hoursa day and fourhours of cleaning, maintenance,moldchange,....

How does themachine?
Allmachine movementsare driven by ahydraulic unit, and the vibrationof the mold (for filling andcompression) ismade up of fouraxes withcounterweights, which makeaunidirectional force, verticaland synchronized.

Arevariablesinstallations,and scalable?
Any facilityconsists ofdifferent machines,and can befroma power mixer, the machinemanufacturer anda car andthenexpand, using90% ofthe investment.

Cycles perminute.
The speedof the machine.The numberof cycles per minuterefers tothe trays withmoistpiecesthatwill manufacturethe machine in aminute.Wordsper minutethe timewe fillthe mold.

The performance ofthe facility isabout 85-80%of the speed ofthe machine.

  • Manufactured aggregates with which you can manufacture slabs, fences and channels of different types and with different techniques for the creation of concrete.
  • The drying of the pieces can become as important as their manufacture, therefore, we believe that it is essential that you have a drying area for the concrete pieces in your factory
  • In this part, we will talk about the importance of humification after drying 24 hours before palletizing.
  • In this part, we offer the reasons why we believe you need a laboratory (forlab) from Rometa in your factory, advising them on what and how to do it
    Quality
    ROMETA incorporates components from leading brands known worldwide in electrical and hydraulic equipment.
    Our company is certified in accordance to standard UNE-EN ISO 9001:2015 and our facilities meet the safety requirements of European Directive EEC 2006/42 / C.

    © ROMETA SA