Space required for placement

 

It is divided into three parts, the first area of machinery, the second zone set and third in patio area (stock, loading and unloading).

* The area of machinery (production and mixing) takes 400 to 600 m2
* The area occupies 600 setting to 800 m2 (depending on weather and hours of work per day).
* The minimum recommended patio area, to distribute the stock of parts made of different models is an area of 4,000 to 10,000 m2 by the customer dimension and the number of final products.

It gives us a total of 1,000 to 1,500 m2 for production and about 4,000 to 10,000 by the Stock, patio, parking, stock of raw materials.

  • Manufactured aggregates with which you can manufacture slabs, fences and channels of different types and with different techniques for the creation of concrete.
  • The drying of the pieces can become as important as their manufacture, therefore, we believe that it is essential that you have a drying area for the concrete pieces in your factory
  • In this part, we will talk about the importance of humification after drying 24 hours before palletizing.
  • In this part, we offer the reasons why we believe you need a laboratory (forlab) from Rometa in your factory, advising them on what and how to do it
    Quality
    ROMETA incorporates components from leading brands known worldwide in electrical and hydraulic equipment.
    Our company is certified in accordance to standard UNE-EN ISO 9001:2015 and our facilities meet the safety requirements of European Directive EEC 2006/42 / C.

    © ROMETA SA