IMPROVEMENTS WE CAN IMPLEMENT IN YOUR BLOCK FACTORY

SPRAYING

In this section, we will talk about the importance of humification of the pallets after the first curing 24 hours before palletizing.

How to make a good curing after palletizing?

For a good treatment and maintenance of the machinery, one of the main options is to put the blocks in a shed with a roof full of water sprayers, also known as " shower room ".

In this area, the pallets should be during a few days prior to the sun exposure before delivery to our customers to keep them in an ideal environment and ensure good maintenance before taking them out.

Tips for spray treatment:

Another option is to put in the exit of the roller board a water mechanism similar to a shower in line in order to soak the blocks and provide the compact product with the water needed by the concrete for the curing process.

The final goal is to take advantage of the maximum wear resistance capacity that the concrete can provide and avoid a quick drying of the pieces preventing them from cracking or lowering the wear resistance of the blocks.


Comparte el post

  • Manufactured aggregates with which you can manufacture slabs, fences and channels of different types and with different techniques for the creation of concrete.
  • The drying of the pieces can become as important as their manufacture, therefore, we believe that it is essential that you have a drying area for the concrete pieces in your factory
  • In this part, we will talk about the importance of humification after drying 24 hours before palletizing.
  • In this part, we offer the reasons why we believe you need a laboratory (forlab) from Rometa in your factory, advising them on what and how to do it
    Quality
    ROMETA incorporates components from leading brands known worldwide in electrical and hydraulic equipment.
    Our company is certified in accordance to standard UNE-EN ISO 9001:2015 and our facilities meet the safety requirements of European Directive EEC 2006/42 / C.

    © ROMETA SA